INS Sharda – Major overhauling of main engine propulsion control system at NSRY, Cochin.
INS Sujata – Major overhauling of main engine propulsion control system at WISL, Goa.
2010-2011
Y12627 – INS SATPURA – Installation & commissioning of 2 x 16 PA 6 V STC Engines along with complete automation at MDL, Mumbai.
SLNS SAGARA – Major control routine on 2 x 16 PA 6 V 280 engine propulsion control system at GRSE, Kolkatta.
ICGS SANKALP – Complete ME ( 20 PA 6 B STC ) control system calibration.
INS Shardul – Complete ME ( 2 X 12 PA 6 V STC ) control system calibration.
2009-2010
Yard 12617 – INS SHIVALIK – Installation & commissioning of 2 x 16 PA 6 V 280 STC Engines along with complete automation at
MDL, Mumbai.
INS SUVARNA – Major routines (24 K) of 16 PA 6 V 280 Main Engines at ND (MB)
2008-2009
ICGS VEERA – Overhauling & Alignment of 2 x 16 PA 6 V 280 engine & complete propulsion control systems.
ICGS VARUNA – Overhauling & Alignment of 2 x 16PA 6 V 280 engine at Mbpt, Mumbai
ICGS VAJRA – Major control routine on 2 x 16PA 6 V 280 engine propulsion control system
2007-2008
GTV SAMUDRA SARVEKSHAK – Major overhauling of 2X 6PA6 L engines
INS SUBHADRA – Major overhauling of main engine propulsion control system at NSRY, Karwar.
2006
ICGS VIJAYA – Midlife routines of 2 x 16 PA 6 V 280 Engines, along with complete automation
Srilankan Naval Ship Sayura – Midlife routine of propulsion control systems at Naval Dockyard, VISAKHAPATNAM.
2005
Major routines of 2 x 8 PA4 main engines with complete automation – TUG BAJRANG AT ND, MUMBAI
ICGS VARAD – Alignment of 2 x 16 PA6 V 280 engine
ICGS SAMAR – Major Breakdown due to water hammering / 12000 hrly routines of 2 x 4.8 MW engine at Naval Dockyard, Mumbai
2004
Midlife routine of propulsion control systems ON 18 PA 6 V 280 INS KHUKRI at ND, VISAKHAPATNAM.
2000-2001
Installation Commissioning of 2X 18 pa 6 v 280 Engines, Advance controls with complete automation – Indian Navy Yard 13845 /INS Kirch at MDL, Mumbai
Major routines of 2 x 8 PA4 main engines with complete automation – TUG BALRAM AT ND, MUMBAI
1999
ICGS VIGRAHA – 12000 hrly routines of 2 x 16 PA 6 V 280 Main Propulsion Engines
1994
2 X 9 cyl. KOEL Pielstick Engines with KEC alternators. We executed complete project work with material handling, Electrical, Mechanical system installation, Cabling Testing and Alignment of equipment and 5 MW DG sets testing.
– Core Parenteral, Sachana, Ahmedabad
Installation Commissioning of 2 X 16PA6V280 Engines & Leroi Sommer Alternator. We executed Electrical & Mechanical installation, Alignment of the rigid type coupling, System testing and commissioning: Gujrat Ambuja Cotspin Ltd., Himatnagar, Ahmedabad
1993
Installation Commissioning of 2.5 MW KOEL-Pielstick engine with KEC Alternator. Rigid type of installation with semi flexible coupling. Here we also commissioned advance control system along with the set.: Tata Electric Co. Mumbai
1992
Installation Commissioning of 2 X 2.5 MW KOEL Pielstick DG Sets along with equipment, Cabling, commissioning of Controls, Testing and grid parallel operation Trials.: Lupin Chemicals, MIDC Tarapur
1989
Installation Commissioning of 2X 16PA6V280 Engines (2x 6400BHP) & Advance controls with complete automation:
Coast Guard Yard 787
1988
Installation Commissioning of 2X 16PA6V280 Engines (2x 6400BHP) & Advance controls with complete automation:
Coast Guard Yard 786
1987
Installation Commissioning of 2X 16PA6V280 Engines (2x 6400BHP) & Advance controls with complete automation:
Coast Guard Yard 785