Major Achievements

2011-2012
  • INS Sharda – Major overhauling of main engine propulsion control system at NSRY, Cochin.
  • INS Sujata – Major overhauling of main engine propulsion control system at WISL, Goa.
2010-2011
  • Y12627 – INS SATPURA – Installation & commissioning of 2 x 16 PA 6 V STC Engines along with complete  automation  at MDL, Mumbai.
  • SLNS SAGARA – Major control routine on  2 x 16 PA 6 V 280 engine propulsion control system  at GRSE, Kolkatta.
  •  ICGS SANKALP – Complete ME ( 20 PA 6 B STC ) control system calibration.
  •  INS Shardul – Complete ME ( 2 X 12 PA 6 V  STC ) control system calibration.
2009-2010
  • Yard 12617 – INS SHIVALIK – Installation & commissioning of 2 x 16 PA 6 V 280 STC Engines along with complete  automation  at
  • MDL, Mumbai.
    INS SUVARNA – Major routines (24 K) of 16 PA 6 V 280 Main Engines at ND (MB)
2008-2009
  • ICGS VEERA – Overhauling & Alignment of 2 x  16 PA 6 V 280  engine & complete propulsion control systems.
  •  ICGS VARUNA – Overhauling & Alignment of 2 x 16PA 6 V 280 engine at Mbpt, Mumbai
  •  ICGS VAJRA – Major control routine on  2 x 16PA 6 V 280 engine propulsion control system
2007-2008
  • GTV SAMUDRA SARVEKSHAK – Major overhauling of 2X 6PA6 L engines
  •  INS SUBHADRA – Major overhauling of main engine propulsion control system at NSRY, Karwar.
2006
  •  ICGS VIJAYA – Midlife routines of 2 x 16 PA 6 V 280 Engines, along with complete automation
  •  Srilankan Naval Ship Sayura – Midlife routine of propulsion control systems at Naval Dockyard, VISAKHAPATNAM.
2005
  • Major routines of 2 x 8 PA4 main engines with complete automation – TUG BAJRANG AT  ND, MUMBAI
  • ICGS VARAD – Alignment of 2 x 16 PA6 V 280 engine
  • ICGS SAMAR – Major Breakdown due to water hammering / 12000 hrly routines of 2 x 4.8 MW engine at Naval Dockyard, Mumbai
2004
  • Midlife routine of propulsion control systems ON 18 PA 6 V 280  INS KHUKRI at ND, VISAKHAPATNAM.
2000-2001
  • Installation   Commissioning  of 2X 18 pa 6 v 280 Engines, Advance controls with  complete automation – Indian Navy Yard 13845 /INS Kirch at MDL, Mumbai
  • Major routines of 2 x 8 PA4 main engines with complete automation – TUG BALRAM AT  ND, MUMBAI
1999
  • ICGS VIGRAHA – 12000 hrly routines of 2 x 16 PA 6 V 280 Main Propulsion Engines
1994
  • 2 X 9 cyl. KOEL Pielstick Engines with KEC alternators. We executed complete project work with material handling, Electrical, Mechanical system installation, Cabling Testing and Alignment of equipment and 5 MW DG sets testing.
    – Core Parenteral,   Sachana, Ahmedabad
  • Installation   Commissioning  of 2 X 16PA6V280 Engines & Leroi  Sommer Alternator. We executed Electrical & Mechanical installation, Alignment of the rigid type coupling, System testing and commissioning: Gujrat  Ambuja Cotspin Ltd., Himatnagar, Ahmedabad
1993
  • Installation Commissioning of 2.5 MW KOEL-Pielstick engine with KEC Alternator. Rigid type of installation with semi flexible coupling. Here we also commissioned advance control   system along    with the set.: Tata Electric Co. Mumbai
1992
  • Installation   Commissioning  of 2 X 2.5 MW KOEL Pielstick DG Sets along with equipment, Cabling, commissioning of Controls, Testing and grid parallel operation Trials.: Lupin Chemicals, MIDC Tarapur
1989
  • Installation Commissioning  of 2X 16PA6V280 Engines (2x 6400BHP) & Advance controls with complete automation:
    Coast Guard Yard 787
1988
  • Installation  Commissioning  of 2X 16PA6V280 Engines (2x 6400BHP) &  Advance controls with  complete automation:
    Coast Guard Yard 786
1987
  • Installation Commissioning  of 2X 16PA6V280 Engines (2x 6400BHP) & Advance controls with complete automation:
    Coast Guard Yard 785
Contact information

Unit B-8, Ground Floor, Sussex Industrial Estate, Dadoji Konddeo Cross Road, Byculla (East),Mumbai- 400027.

Email: ashmanthan@yahoo.com

Phone: +91-22-23731753
Fax: +91-22-23782959

Copyright © 2015, Manthan Marines. All rights reserved.